Black Hills Power, Inc./Joint Open Access Transmission Tariff
Effective as of:    

 
View/Export Options
 
Section Data Options
 
 
  
SelectSection Title
Title and Table of Contents, Section 0 , 2.0.0
Definitions, Section I.1 , 0.0.0
Initial Allocation and Renewal Procedures, Section I.2 , 0.0.0
Ancillary Services, Section I.3 , 0.0.0
Open Access Same-Time Information System (OASIS), Section I.4 , 1.1.0
Local Furnishing Bonds, Section I.5 , 0.0.0
Reciprocity, Section I.6 , 0.0.0
Billing and Payment, Section I.7 , 0.0.0
Accounting for the Transmission Provider's Use of the Tariff, Section I.8 , 0.0.0
Regulatory Filings, Section I.9 , 0.0.0
Force Majeure and Indemnification, Section I.10 , 0.0.0
Creditworthiness, Section I.11 , 0.0.0
Dispute Resolution Procedures, Section I.12 , 0.0.0
Part II Preamble, Section II.0 Preamble , 0.0.0
Nature of Firm Point-to-Point Transmission Service, Section II.13 , 2.0.0
Nature of Non-Firm Point-To-Point Transmission Service, Section II.14 , 1.0.0
Service Availability, Section II.15 , 0.0.0
Transmission Customer Responsibilities, Section II.16 , 0.0.0
Procedures for Arranging Firm PTP Transmission Service, Section II.17 , 1.0.0
Procedures for Arranging NF PTP Transmission Service, Section II.18 , 1.0.0
Add’l Study Procedures For Firm PTP Trans Service Requests, Section II.19 , 0.0.0
Procs if TP Unable to Compl New Facs for Firm PTP Trans Serv, Section II.20 , 0.0.0
Provs Rlt'g to Trans Const/Servs on Systems of Other Utils, Section II.21 , 0.0.0
Changes in Service Specifications, Section II.22 , 0.0.0
Sale or Assignment of Transmission Service, Section II.23 , 1.0.0
NF PTP Trans Serv on AC Trans Sys, Schedule 8 , 1.1.0
LT/ST Firm PTP Trans Serv on AC Trans Sys, Schedule 7 , 1.1.0
Metering/Power Fact Corr at Receipt/Delivery Pts, Section II.24 , 0.0.0
Compensation for Transmission Service, Section II.25 , 0.0.0
Stranded Cost Recovery, Section II.26 , 0.0.0
Compensation for New Facilities and Redispatch Costs, Section II.27 , 0.0.0
Part III Preamble, Section III.0 , 0.0.0
Nature of Network Integration Transmission Service, Section III.28 , 0.0.0
Initiating Service, Section III.29 , 0.0.0
Network Resources, Section III.30 , 0.0.0
Designation of Network Load, Section III.31 , 0.0.0
Add'l Study Procs For NITS Requests, Section III.32 , 0.0.0
Load Shedding and Curtailments, Section III.33 , 0.0.0
Rates and Charges, Section III.34 , 0.0.0
Operating Arrangements, Section III.35 , 0.0.0
Scheduling, System Control and Dispatch Service, Schedule 1 , 0.0.0
Reactive Pwr/Voltage Ctrl from Gen or Other Sources Serv, Schedule 2 , 4.0.0
Regulation and Frequency Response Service, Schedule 3 , 1.0.0
Energy Imbalance Service, Schedule 4 , 0.0.0
Operating Reserve - Spinning Reserve Service, Schedule 5 , 0.0.0
Operating Reserve - Supplemental Reserve Service, Schedule 6 , 0.0.0
Firm PTP Trans Serv on RC Conv Tie, Schedule 9 , 0.0.0
NF PTP Trans Serv on RC Conv Tie, Schedule 10 , 0.0.0
NITS on AC Trans Sys, Schedule 11 , 0.0.0
NITS on RC Conv Tie, Schedule 12 , 0.0.0
Generator Imbalance Service, Schedule 13 , 0.0.0
Form of SA for Firm PTP Trans Serv, Attachment A , 1.0.0
Form SA for Resale/Reassign/Transfer of PTP Trans Serv, Attachment A-1 , 0.0.0
Form SA for NF PTP Trans Serv, Attachment B , 1.0.0
Methodology to Assess Available Transfer Capability, Attachment C , 2.0.0
Methodology for Completing a System Impact Study, Attachment D , 0.0.0
Index of Point-to-Point Transmission Service Customers, Attachment E , 0.0.0
SA for NITS, BHP JOATT Attach F , 0.0.0
Network Operating Agreement, Attachment G , 0.0.0
Mthly Network Trans Rev Req for Trans Serv on AC Trans Sys, Attachment H , 4.0.0
Index of Network Integration Transmission Service Customers, BHP JOATT Attach I , 0.0.0
Procedures for Addressing Parallel Flows, BHP JOATT Attach J , 0.0.0
Transmission Planning Process, Attachment K , 2.4.0
Creditworthiness Procedures, Attachment L , 0.0.0
Real Power Losses, Attachment M , 0.0.0
Facilities Included in the Transmission System, Attachment N , 0.0.0
Cluster Studies, Attachment O , 0.0.0
Standard Large Generator Interconnection Procedures, Attachment P , 4.2.0
Small Generator Interconnection Procedures and Agreement, Attachment Q , 2.0.0