Spacer
FERC SealFederal Energy Regulatory Commission
 eTariff
 Ver. 1.18.0.0  Help?    
Tariff List Tariff Section Search
 

Tariff Browser

PJM Interconnection, L.L.C. - Intra-PJM Tariffs
(Current View is All Sections as of Today)
List only effective sections as of:     
All Activity      View/Export Tariff

Skip Navigation Links.
Collapse OATT, OATT OPEN ACCESS TRANSMISSION TARIFF (0.0.0)OATT, OATT OPEN ACCESS TRANSMISSION TARIFF (0.0.0)
OATT Table of Contents, PJM OATT Table of Contents (45.0.0)
Collapse I., OATT I. COMMON SERVICE PROVISIONS (0.0.0)I., OATT I. COMMON SERVICE PROVISIONS (0.0.0)
Collapse 1, OATT 1. Definitions (1.0.0)1, OATT 1. Definitions (1.0.0)
A-B, OATT Definitions – A - B (18.2.0)
C-D, OATT Definitions – C-D (34.0.0)
E-F, OATT Definitions – E - F (34.0.0)
G-H, OATT Definitions – G - H (8.0.0)
I-J-K, OATT Definitions – I – J - K (14.0.0)
L-M-N, OATT Definitions – L – M - N (34.0.0)
O-P-Q, OATT Definitions – O – P - Q (27.2.0)
R-S, OATT Definitions – R - S (30.0.0)
T-U-V, OATT Definitions – T – U - V (21.0.0)
W-X-Y-Z, OATT Definitions – W – X – Y - Z (8.0.0)
Collapse 2, OATT 2 Initial Allocation and Renewal Procedures (0.0.0)2, OATT 2 Initial Allocation and Renewal Procedures (0.0.0)
2.1, OATT 2.1 Initial Allocation of Available Transfer Capability (1.0.0)
2.2, OATT 2.2 Reservation Priority For Existing Firm Service Cust (0.0.0)
2.3, OATT 2.3 Procedures For Exercising Transmission Reservation (1.0.0)
2.4, OATT 2.4 Reservation Priority For State Required Retail Acce (0.0.0)
Collapse 3, OATT 3 Ancillary Services (3.0.0)3, OATT 3 Ancillary Services (3.0.0)
3.1, OATT 3.1 Scheduling, System Control and Dispatch Services (2.0.0)
3.2, OATT 3.2 Reactive Supply and Voltage Control from Generation (2.0.0)
3.3, OATT 3.3 Regulation and Frequency Response Service (2.0.0)
3.4, OATT 3.4 Energy Imbalance Service (2.0.0)
3.5, OATT 3.5 Operating Reserve - Synchronized Reserve Service (2.0.0)
3.6, OATT 3.6 Operating Reserve - Supplemental Reserve Service (2.0.0)
3B, OATT 3B PJM Administrative Service (1.0.0)
3C, OATT 3C Mid-Atlantic Area Council Charge (1.0.0)
3D, OATT 3D Transitional Market Expansion Charge (2.0.0)
3E, OATT 3E Transmission Enhancement Charges (1.0.0)
3F, OATT 3F Transmission Losses (1.1.0)
Collapse 4, OATT 4 Open Access Same-Time Information System (OASIS) (0.0.0)4, OATT 4 Open Access Same-Time Information System (OASIS) (0.0.0)
4.1, OATT 4.1 (1.0.0)
4.2, OATT 4.2 (9.1.0)
Collapse 5, OATT 5 Local Furnishing Bonds (0.0.0)5, OATT 5 Local Furnishing Bonds (0.0.0)
5.1, OATT 5.1 Transmission Owners That Own Facilities Financed by (0.0.0)
5.2, OATT 5.2 Alternative Procedures for Requesting Transmission (0.0.0)
6, OATT 6 Reciprocity (0.0.0)
OATT 6A, OATT 6A_Counterparty (5.0.0)
Collapse 7, OATT 7 Billing and Payment (2.0.0)7, OATT 7 Billing and Payment (2.0.0)
7.1, OATT 7.1 Billing Procedure (4.0.0)
7.1A, OATT 7.1A Payments (5.0.0)
7.2, OATT 7.2 Interest on Unpaid Balances (2.0.0)
7.3, OATT 7.3 Customer Default (4.0.0)
OATT 6A, OATT 6A_Counterparty (1.0.0)
Collapse 8, OATT 8 Accounting for a Transmission Owner’s Use of the Tari (0.0.0)8, OATT 8 Accounting for a Transmission Owner’s Use of the Tari (0.0.0)
8.1, OATT 8.1 Transmission Revenues: (1.0.0)
8.2, OATT 8.2 Study Costs and Revenues: (0.0.0)
8.3, OATT 8.3 Generation Interconnection Costs: (1.0.0)
Collapse 9, OATT 9 Regulatory Filings (0.0.0)9, OATT 9 Regulatory Filings (0.0.0)
9.1, OATT 9.1 Rights of the Transmission Owners (2.1.0)
9.2, OATT 9.2 Rights of the Transmission Provider: (1.1.0)
9.3, OATT 9.3 Disputes Regarding Filing Rights (2.1.0)
9.4, OATT 9.4 Mobile Sierra: (1.1.0)
Collapse 10, OATT 10 Force Majeure and Indemnification (0.0.0)10, OATT 10 Force Majeure and Indemnification (0.0.0)
10.1, OATT 10.1 Force Majeure: (1.0.0)
10.2, OATT 10.2 Liability: (2.0.0)
10.3, OATT 10.3 Indemnification: (1.0.0)
10.4, OATT 10.4 Limitation on Claims (3.0.0)
11, OATT 11 Creditworthiness (1.0.0)
Collapse 12, OATT 12 Dispute Resolution Procedures (0.0.0)12, OATT 12 Dispute Resolution Procedures (0.0.0)
12.1, OATT 12.1 Internal Dispute Resolution Procedures: (0.0.0)
12.2, OATT 12.2 External Arbitration Procedures: (0.0.0)
12.3, OATT 12.3 Arbitration Decisions: (0.0.0)
12.4, OATT 12.4 Costs: (0.0.0)
12.5, OATT 12.5 Rights Under The Federal Power Act: (0.0.0)
12A, OATT 12A PJM Compliance Review (1.0.0)
Collapse II, OATT II. POINT-TO-POINT TRANSMISSION SERVICE (2.0.0)II, OATT II. POINT-TO-POINT TRANSMISSION SERVICE (2.0.0)
Collapse 13, OATT 13 Nature of Firm Point-To-Point Transmission Service (0.0.0)13, OATT 13 Nature of Firm Point-To-Point Transmission Service (0.0.0)
13.1, OATT 13.1 Term: (0.0.0)
13.2, OATT 13.2 Reservation Priority: (1.0.0)
13.3, OATT 13.3 Use of Firm Transmission Service by a Transmissio (1.0.0)
13.4, OATT 13.4 Service Agreements: (1.0.0)
13.5, OATT 13.5 Transmission Customer Obligations for Facility Ad (1.0.0)
13.6, OATT 13.6 Curtailment of Firm Transmission Service: (0.0.0)
13.6A, OATT 13.6A Load Shedding: (0.0.0)
13.7, OATT 13.7 Classification of Firm Transmission Service: (3.0.0)
13.8, OATT 13.8 Scheduling of Firm Point-To-Point Transmission Ser (1.1.0)
Collapse 14, OATT 14 Nature of Non-Firm Point-To-Point Transmission Servi (0.0.0)14, OATT 14 Nature of Non-Firm Point-To-Point Transmission Servi (0.0.0)
14.1, OATT 14.1 Term: (1.0.0)
14.2, OATT 14.2 Reservation Priority (2.0.0)
14.3, OATT 14.3 Use of Non-Firm Point-To-Point Transmission Servi (1.0.0)
14.4, OATT 14.4 Service Agreements: (1.0.0)
14.5, OATT 14.5 Classification of Non-Firm Point-To-Point Transmi (1.0.0)
14.6, OATT 14.6 Scheduling of Non-Firm Point-To-Point Transmissio (1.1.0)
14.7, OATT 14.7 Curtailment or Interruption of Service: (0.0.0)
Collapse 15, OATT 15 Service Availability (0.0.0)15, OATT 15 Service Availability (0.0.0)
15.1, OATT 15.1 General Conditions: (1.0.0)
15.2, OATT 15.2 Determination of Available Transfer Capability: (3.0.0)
15.3, OATT 15.3 Initiating Service in the Absence of an Executed (1.0.0)
15.4, OATT 15.4 Obligation to Provide Transmission Service that R (1.0.0)
15.5, OATT 15.5 Deferral of Service: (0.0.0)
15.6, OATT 15.6 Other Transmission Service Schedules: (0.0.0)
15.7, OATT 15.7 [Reserved] (1.1.0)
Collapse 16, OATT 16 Transmission Customer Responsibilities (0.0.0)16, OATT 16 Transmission Customer Responsibilities (0.0.0)
16.1, OATT 16.1 Conditions Required of Transmission Customers: (1.0.0)
16.2, OATT 16.2 Transmission Customer Responsibility for Third-Pa (1.0.0)
Collapse 17, OATT 17 Procedures for Arranging Firm Point-To-Point Transmi (0.0.0)17, OATT 17 Procedures for Arranging Firm Point-To-Point Transmi (0.0.0)
17.1, OATT 17.1 Application: (3.0.0)
17.2, OATT 17.2 Completed Application: (3.0.0)
17.3, OATT 17.3 Compliance with Credit Policy: (1.0.0)
17.4, OATT 17.4 Notice of Deficient Application: (2.0.0)
17.5, OATT 17.5 Response to a Completed Application: (3.0.0)
17.6, OATT 17.6 Execution of Service Agreement: (3.0.0)
17.7, OATT 17.7 Extensions for Commencement of Service: (0.0.0)
17.8, OATT 17.8 Reservation of Short-Term Firm Point-To-Point Tra (2.0.0)
17.9, OATT 17.9 Increases in Transfer Capability for Short-Term T (2.0.0)
Collapse 18, OATT 18 Procedures for Arranging Non-Firm Point-To-Point Tra (0.0.0)18, OATT 18 Procedures for Arranging Non-Firm Point-To-Point Tra (0.0.0)
18.1, OATT 18.1 Application: (0.0.0)
18.2, OATT 18.2 Completed Application: (1.0.0)
18.3, OATT 18.3 Reservation of Non-Firm Point-To-Point Transmissi (1.0.0)
18.4, OATT 18.4 Determination of Available Transfer Capability: (1.0.0)
Collapse 19, OATT 19 Initial Study Procedures For Long-Term Firm Point-To (2.0.0)19, OATT 19 Initial Study Procedures For Long-Term Firm Point-To (2.0.0)
19.1, OATT 19.1 Notice of Need for Initial Study: (4.0.0)
19.2, OATT 19.2 Initial Study Agreement and Cost Reimbursement: (4.0.0)
19.3, OATT 19.3 Initial Study Procedures: (3.0.0)
19.3.1, OATT 19.3.1 Meeting with Transmission Provider (1.0.0)
19.4, OATT 19.4 Retaining Queue Position: (3.0.0)
19.5, OATT 19.5 [Reserved] (0.0.0)
19.6, OATT 19.6 [Reserved] (0.0.0)
19.7, OATT 19.7 Partial Interim Service: (0.0.0)
19.8, OATT 19.8 Penalties for Failure to Meet Deadlines: (3.0.0)
20, OATT 20 [Reserved] (0.0.0)
21, OATT 21 [Reserved] (0.0.0)
Collapse 22, OATT 22 Changes in Service Specifications (0.0.0)22, OATT 22 Changes in Service Specifications (0.0.0)
22.1, OATT 22.1 Modifications On a Non-Firm Basis: (1.0.0)
22.2, OATT 22.2 Modification On a Firm Basis: (2.0.0)
Collapse 23, OATT 23 Sale or Assignment of Transmission Service (0.0.0)23, OATT 23 Sale or Assignment of Transmission Service (0.0.0)
23.1, OATT 23.1 Procedures for Assignment or Transfer of Service (4.0.0)
23.2, OATT 23.2 Limitations on Assignment or Transfer of Service: (1.0.0)
23.3, OATT 23.3 Information on Assignment or Transfer of Service: (1.0.0)
Collapse 24, OATT 24 Metering and Power Factor Correction at Receipt and (0.0.0)24, OATT 24 Metering and Power Factor Correction at Receipt and (0.0.0)
24.1, OATT 24.1 Transmission Customer Obligations: (1.0.0)
24.2, OATT 24.2 Transmission Provider Access to Metering Data: (0.0.0)
24.3, OATT 24.3 Power Factor: (0.0.0)
25, OATT 25 Compensation for Transmission Service (1.0.0)
26, OATT 26 Stranded Cost Recovery (0.0.0)
Collapse 27, OATT 27 Compensation for New Facilities and Redispatch Costs (0.0.0)27, OATT 27 Compensation for New Facilities and Redispatch Costs (0.0.0)
27.1, OATT 27.1 New Facilities and Redispatch: (0.0.0)
27.2, OATT 27.2 Redispatch Using Locational Marginal Prices: (1.0.0)
27A, OATT 27A Distribution of Revenues from Non-Firm Point-to-Po (1.0.0)
Collapse III, OATT III. NETWORK INTEGRATION TRANSMISSION SERVICE (2.0.0)III, OATT III. NETWORK INTEGRATION TRANSMISSION SERVICE (2.0.0)
Collapse 28, OATT 28 Nature of Network Integration Transmission Service (0.0.0)28, OATT 28 Nature of Network Integration Transmission Service (0.0.0)
28.1, OATT 28.1 Scope of Service: (1.0.0)
28.2, OATT 28.2 Transmission Provider Responsibilities: (1.0.0)
28.3, OATT 28.3 Network Integration Transmission Service: (0.0.0)
28.4, OATT 28.4 Secondary Service: (1.0.0)
28.5, OATT 28.5 [Reserved] (0.0.0)
28.6, OATT 28.6 Restrictions on Use of Service: (1.0.0)
Collapse 29, OATT 29 Initiating Service (0.0.0)29, OATT 29 Initiating Service (0.0.0)
29.1, OATT 29.1 Condition Precedent for Receiving Service (2.0.0)
29.2, OATT 29.2 Application Procedures: (2.0.0)
29.2A, OATT 29.2A Determination of Available Transfer Capability (2.0.0)
29.3, OATT 29.3 Technical Arrangements to be Completed Prior to C (1.0.0)
29.4, OATT 29.4 Network Customer Facilities: (0.0.0)
29.5, OATT 29.5 Filing of Service Agreement: (0.0.0)
Collapse 30, OATT 30 Network Resources (0.0.0)30, OATT 30 Network Resources (0.0.0)
30.1, OATT 30.1 Designation of Network Resources: (0.0.0)
30.2, OATT 30.2 Designation of New Network Resources: (2.0.0)
30.3, OATT 30.3 Termination of Network Resources: (1.0.0)
30.4, OATT 30.4 Operation of Network Resources: (1.0.0)
30.5, OATT 30.5 Network Customer Redispatch Obligation: (1.0.0)
30.6, OATT 30.6 Transmission Arrangements for Network Resources N (0.0.0)
30.7, OATT 30.7 Limitation on Designation of Network Resources: (1.0.0)
30.8, OATT 30.8 Use of Interface Capacity by the Network Customer (0.0.0)
30.9, OATT 30.9 Network Customer Owned Transmission Facilities: (0.0.0)
Collapse 31, OATT 31 Designation of Network Load (1.0.0)31, OATT 31 Designation of Network Load (1.0.0)
31.1, OATT 31.1 Network Load: (0.0.0)
31.2, OATT 31.2 New Network Loads Connected With the Transmission (1.0.0)
31.3, OATT 31.3 Network Load Not Physically Interconnected with t (1.0.0)
31.4, OATT 31.4 New Interconnection Points: (0.0.0)
31.5, OATT 31.5 Changes in Service Requests: (0.0.0)
31.6, OATT 31.6 Annual Load and Resource Information Updates: (1.0.0)
31.7, OATT 31.7 Changing Network Load Energy Settlement Area Defi (4.0.0)
Collapse 32, OATT 32 Initial Study Procedures For Network Integration Tra (2.0.0)32, OATT 32 Initial Study Procedures For Network Integration Tra (2.0.0)
32.1, OATT 32.1 Notice of Need for Initial Study: (2.0.0)
32.2, OATT 32.2 Initial Study Agreement and Cost Reimbursement: (3.0.0)
32.3, OATT 32.3 Initial Study Procedures: (3.0.0)
32.3.1, OATT 32.3.1 Meeting with Transmission Provider (1.0.0)
32.4, OATT 32.4 Retaining Queue Position: (2.0.0)
32.5, OATT 32.5 Penalties for Failure to Meet Study Deadlines: (3.0.0)
Collapse 33, OATT 33 Load Shedding and Curtailments (0.0.0)33, OATT 33 Load Shedding and Curtailments (0.0.0)
33.1, OATT 33.1 Procedures: (0.0.0)
33.2, OATT 33.2 Transmission Constraints: (0.0.0)
33.3, OATT 33.3 Cost Responsibility for Relieving Transmission Co (1.0.0)
33.4, OATT 33.4 Curtailments of Scheduled Deliveries: (0.0.0)
33.5, OATT 33.5 Allocation of Curtailments: (0.0.0)
33.6, OATT 33.6 Load Shedding: (0.0.0)
33.7, OATT 33.7 System Reliability: (0.0.0)
Collapse 34, OATT 34 Rates and Charges (1.0.0)34, OATT 34 Rates and Charges (1.0.0)
34.1, OATT 34.1 Monthly Demand Charge: (1.0.0)
34.2, OATT 34.2 Netting of Behind the Meter Generation. (0.0.0)
34.3, OATT 34.3 Netting of Non-Retail Behind The Meter Generation (1.0.0)
34.4, OATT 34.4 Redispatch Charge: (1.0.0)
34.5, OATT 34.5 Stranded Cost Recovery: (0.0.0)
Collapse 35, OATT 35 Operating Arrangements (0.0.0)35, OATT 35 Operating Arrangements (0.0.0)
35.1, OATT 35.1 Operation under The Network Operating Agreement: (0.0.0)
35.2, OATT 35.2 Network Operating Agreement: (1.0.0)
35.3, OATT 35.3 Network Operating Committee: (0.0.0)
Collapse OATT IV, OATT IV. INTERCONNECTIONS WITH THE TRANSMISSION SYSTEM (4.0.0)OATT IV, OATT IV. INTERCONNECTIONS WITH THE TRANSMISSION SYSTEM (4.0.0)
Collapse Subpart A, OATT Subpart A – INTERCONNECTION PROCEDURES (0.0.0)Subpart A, OATT Subpart A – INTERCONNECTION PROCEDURES (0.0.0)
Collapse 36, OATT 36 Interconnection Requests (0.0.0)36, OATT 36 Interconnection Requests (0.0.0)
36.1, OATT 36.1 General (9.0.0)
36.1A, OATT 36.1A Behind The Meter Generation: (3.0.0)
36.2, OATT 36.2 Interconnection Feasibility Study (4.0.0)
36.2A, OATT 36.2A Modification of Interconnection Request (4.0.0)
36.3, OATT 36.3 Upgrade Feasibility Study (1.0.0)
36.4, OATT 36.4 Surplus Interconnection Study (1.0.0)
37, OATT 37 Additional Procedures: (1.0.0)
38, OATT 38 Service on Merchant Transmission Facilities: (1.0.0)
Collapse 39, OATT 39 Local Furnishing Bonds (0.0.0)39, OATT 39 Local Furnishing Bonds (0.0.0)
39.1, OATT 39.1 Transmission Owners That Own Facilities (1.0.0)
39.2, OATT 39.2 Alternative Procedures for Requesting Interconnect (1.0.0)
OATT 40-108, OATT 40 – 108 [Reserved.] (1.0.0)
Collapse 41, OATT 41 Interconnection Study Statistics (0.0.0)41, OATT 41 Interconnection Study Statistics (0.0.0)
41.1, OATT 41.1 Interconnection Feasibility Studies Processing (0.0.0)
41.2, OATT 41.2 Interconnection System Impact Studies Processing (0.0.0)
41.3, OATT 41.3 Interconnection Facilities Studies Processing Time (0.0.0)
41.4, OATT 41.4 Interconnection Service Requests Withdrawn (0.0.0)
41.5, OATT 41.5 Posting Requirements (0.0.0)
41.6, OATT 41.6 Additional Compliance Obligations (1.0.0)
OATT 42-108, OATT 42-108 [Reserved] (0.0.0)
Subpart B, OATT Subpart B – [Reserved.] (0.0.0)
Subpart C, OATT Subpart C – [Reserved.] (0.0.0)
Subpart D, OATT Subpart D – [Reserved.] (0.0.0)
Subpart E, OATT Subpart E – [Reserved.] (0.0.0)
Subpart F, OATT Subpart F – [Reserved.] (0.0.0)
Collapse OATT Subpart G, OATT Subpart G – SMALL GENERATION INTERCONNECTION PROCEDURE (2.0.0)OATT Subpart G, OATT Subpart G – SMALL GENERATION INTERCONNECTION PROCEDURE (2.0.0)
109, OATT 109 Pre-Application Process (2.0.0)
Collapse OATT 110, OATT 110 Permanent Capacity Resource Additions of 20 MW or L (1.1.0)OATT 110, OATT 110 Permanent Capacity Resource Additions of 20 MW or L (1.1.0)
OATT 110.1, OATT 110.1 Application (10.0.0)
110.2, OATT 110.2 Feasibility Study (3.0.0)
110.3, OATT 110.3 System Impact Study (2.0.0)
110.4, OATT 110.4 Facilities Study (3.0.0)
110.5, OATT 110.5 Interconnection Service Agreement (3.0.0)
110.6, OATT 110.6 Other Requirements (0.0.0)
Collapse 111, OATT 111 Permanent Energy Resource Additions of 20 MW or Les (2.0.0)111, OATT 111 Permanent Energy Resource Additions of 20 MW or Les (2.0.0)
OATT 111.1, OATT 111.1 Application (9.0.0)
111.2, OATT 111.2 Feasibility Study (3.0.0)
111.3, OATT 111.3 System Impact Study (1.0.0)
111.4, OATT 111.4 Facilities Study (3.0.0)
111.5, OATT 111.5 Interconnection Service Agreement (2.0.0)
111.6, OATT 111.6 Other Requirements (0.0.0)
Collapse 112, OATT 112 Temporary Energy Resource Additions of 20 MW or Les (2.0.0)112, OATT 112 Temporary Energy Resource Additions of 20 MW or Les (2.0.0)
OATT 112.1, OATT 112.1 Application (8.0.0)
112.2, OATT 112.2 Feasibility/Impact/Facilities Study (0.0.0)
112.3, OATT 112.3 Interconnection Service Agreement (2.0.0)
112.4, OATT 112.4 Other Requirements (0.0.0)
Collapse 112A, OATT 112A Permanent or Temporary Energy Resources of 2 MW or (2.0.0)112A, OATT 112A Permanent or Temporary Energy Resources of 2 MW or (2.0.0)
OATT 112A.1, OATT 112A.1 Application (10.0.0)
112A.2, OATT 112A.2 Screens (2.0.0)
112A.3, OATT 112A.3 Results of Screens (4.0.0)
112A.4, OATT 112A.4 Customer Options Meeting (3.0.0)
112A.5, OATT 112A.5 Supplemental Review (3.0.0)
Collapse 112B, OATT 112B Certified Inverter-Based Small Generating Faciliti (1.0.0)112B, OATT 112B Certified Inverter-Based Small Generating Faciliti (1.0.0)
112B.1, OATT 112B.1 Application (3.0.0)
112B.2, OATT 112B.2 Verification of Interconnection (2.0.0)
112B.3, OATT 112B.3 Certificate of Completion and Inspection (2.0.0)
112B.4, OATT 112B.4 Interconnection and Operation (1.0.0)
112B.5, OATT 112B.5 Safe Operations and Maintenance (0.0.0)
112B.6, OATT 112B.6 Access (0.0.0)
112B.7, OATT 112B.7 Disconnection (1.0.0)
112B.8, OATT 112B.8 Indemnification (1.0.0)
112B.9, OATT 112B.9 Insurance (1.0.0)
112B.10, OATT 112B.10 Limitation of Liability (1.0.0)
112B.11, OATT 112B.11 Termination (0.0.0)
112B.12, OATT 112B.12 Assignment/Transfer of Ownership of the Small (0.0.0)
OATT 112C, OATT 112C Alternate Queue Process (3.0.0)
Collapse V, OATT V. GENERATION DEACTIVATION (0.0.0)V, OATT V. GENERATION DEACTIVATION (0.0.0)
113, OATT 113 Notices (2.0.0)
114, OATT 114 Deactivation Avoidable Cost Credit: (1.0.0)
115, OATT 115 Deactivation Avoidable Cost Rate: (0.0.0)
116, OATT 116 Filing and Updating of Deactivation Avoidable Cost (0.0.0)
117, OATT 117 Excess Project Investment Required: (0.0.0)
118, OATT 118 Refund of Project Investment Reimbursement: (0.0.0)
118A, OATT 118A Recovery of Project Investment: (0.0.0)
119, OATT 119 Cost of Service Recovery Rate: (1.0.0)
120, OATT 120 Cost Allocation: (0.0.0)
121, OATT 121 Performance Standards: (0.0.0)
122, OATT 122 Black Start Units: (0.0.0)
123-199, OATT 123-199 [Reserved] (0.0.0)
Collapse VI, OATT VI. ADMINISTRATION AND STUDY OF NEW SERVICE REQUESTS; R (0.0.0)VI, OATT VI. ADMINISTRATION AND STUDY OF NEW SERVICE REQUESTS; R (0.0.0)
Collapse VI Preamble, OATT Part VI Preamble (1.0.0)VI Preamble, OATT Part VI Preamble (1.0.0)
200, OATT 200 Applicability: (2.0.0)
201, OATT 201 Queue Position: (3.0.0)
Collapse Subpart A, OATT Subpart A – System Impact Studies and Facilities Studie (0.0.0)Subpart A, OATT Subpart A – System Impact Studies and Facilities Studie (0.0.0)
202, OATT 202 Coordination with Affected Systems: (2.0.0)
Collapse 203, OATT 203 System Impact Study Agreement: (1.0.0)203, OATT 203 System Impact Study Agreement: (1.0.0)
203.1, OATT 203.1 Cost Responsibility: (2.0.0)
Collapse 204, OATT 204 Tender of System Impact Study Agreement: (0.0.0)204, OATT 204 Tender of System Impact Study Agreement: (0.0.0)
204.1, OATT 204.1 Completed Applications: (4.0.0)
204.2, OATT 204.2 Upgrade Requests: (4.0.0)
204.3, OATT 204.3 Interconnection Requests: (4.0.0)
Collapse 205, OATT 205 System Impact Study Procedures: (0.0.0)205, OATT 205 System Impact Study Procedures: (0.0.0)
205.1, OATT 205.1 Coordination: (1.0.0)
205.2, OATT 205.2 Scope of Studies: (3.2.0)
205.3, OATT 205.3 Timing of Studies: (2.0.0)
205.4, OATT 205.4 Completion of Studies: (2.0.0)
205.5, OATT 205.5 Re-Study: (1.0.0)
Collapse 206, OATT 206 Facilities Study Agreement: (1.0.0)206, OATT 206 Facilities Study Agreement: (1.0.0)
206.1, OATT 206.1 Study Agreement: (1.0.0)
206.2, OATT 206.2 Retaining Queue Position: (2.0.0)
206.3, OATT 206.3 Deposit: (1.0.0)
206.4, OATT 206.4 Allocation of Costs: (1.0.0)
206.5, OATT 206.5 Estimates of Certain Upgrade-Related Rights: (1.0.0)
Collapse 207, OATT 207 Facilities Study Procedures: (1.1.0)207, OATT 207 Facilities Study Procedures: (1.1.0)
207.1, OATT 207.1 Meeting with Transmission Provider: (0.0.0)
207.2, OATT 207.2 Re-Study: (1.0.0)
207.3, OATT 207.3 Facilities Study Modifications: (0.0.0)
208 Expedited Procedures, OATT 208 Expedited Procedures for Part II Requests: (1.0.0)
Collapse 209, OATT 209 Optional Interconnection Studies: (0.0.0)209, OATT 209 Optional Interconnection Studies: (0.0.0)
209.1, OATT 209.1 Optional Interconnection Study Agreement: (2.0.0)
209.2, OATT 209.2 Scope of Optional Interconnection Study: (0.0.0)
209.3, OATT 209.3 Optional Interconnection Study Procedures: (1.0.0)
210, OATT 210 Responsibilities of the Transmission Provider and T (1.0.0)
Collapse Subpart B, OATT Subpart B – Agreements and Cost Responsibility (0.0.0)Subpart B, OATT Subpart B – Agreements and Cost Responsibility (0.0.0)
Collapse 211, OATT 211 Interim Interconnection Service Agreement: (2.0.0)211, OATT 211 Interim Interconnection Service Agreement: (2.0.0)
211.1, OATT 211.1 Payment of Costs on Cancellation: (2.0.0)
Collapse 212, OATT 212 Interconnection Service Agreement (3.0.0)212, OATT 212 Interconnection Service Agreement (3.0.0)
212.1, OATT 212.1 Cost Reimbursement: (1.0.0)
212.2, OATT 212.2 Upgrade-Related Rights: (1.0.0)
212.3, OATT 212.3 Specification of Transmission Owners Responsible (1.0.0)
212.4, OATT 212.4 Retaining Priority and Security: (3.0.0)
212.5, OATT 212.5 Milestones: (0.0.0)
212.6, OATT 212.6 Interconnection Construction Service Agreement an (3.0.0)
OATT 212.7, OATT 212.7 Interconnection Service Agreement and Interconnec (1.0.0)
Collapse 213, OATT 213 Upgrade Construction Service Agreement: (1.0.0)213, OATT 213 Upgrade Construction Service Agreement: (1.0.0)
213.1, OATT 213.1 Cost Reimbursement: (1.0.0)
213.2, OATT 213.2 Upgrade-Related Rights: (1.0.0)
213.3, OATT 213.3 Specification of Transmission Owners Responsible (1.0.0)
213.4, OATT 213.4 Retaining Priority and Security: (4.0.0)
213.5, OATT 213.5 Commencement of Construction: (0.0.0)
213.6, OATT 213.6 Procedures if The Affected Transmission Owners ar (1.0.0)
213.7, OATT 213.7 Due Diligence in Completing New Facilities: (0.0.0)
OATT 213.8, OATT 213.8 Upgrade Construction Service Agreement Execution (1.0.0)
214, OATT 214 Filing/Reporting of Agreements: (0.0.0)
215, OATT 215 Transmission Service Agreements: (1.0.0)
Collapse 216, OATT 216 Interconnection Requests Designated As Market Solut (2.0.0)216, OATT 216 Interconnection Requests Designated As Market Solut (2.0.0)
216.1, OATT 216.1 Notification And Acceptance Of Market Solution De (1.0.0)
216.2, OATT 216.2 Development Agreement: (1.0.0)
Collapse 217, OATT 217 Cost Responsibility for Necessary Facilities and Up (0.0.0)217, OATT 217 Cost Responsibility for Necessary Facilities and Up (0.0.0)
217.1, OATT 217.1 Attachment Facilities: (0.0.0)
217.2, OATT 217.2 Direct Assignment Facilities: (0.0.0)
217.3, OATT 217.3 Local and Network Upgrades (4.0.0)
217.4, OATT 217.4 Additional Upgrades: (1.0.0)
217.5, OATT 217.5 Specification of Costs in Agreement: (1.0.0)
217.6, OATT 217.6 Effect of IDR Transfer Agreement: (1.0.0)
217.7, OATT 217.7 Regional Transmission Expansion Plan: (1.0.0)
217.8, OATT 217.8 Interconnected TO Initial Funding of Upgrades (0.1.0)
Collapse 218, OATT 218 New Service Requests Involving Affected Systems: (0.0.0)218, OATT 218 New Service Requests Involving Affected Systems: (0.0.0)
218.1, OATT 218.1 Local Upgrades and Network Upgrades on Affected S (0.0.0)
218.2, OATT 218.2 Generation and Transmission Interconnecting with (1.0.0)
218.3, OATT 218.3 Coordination of Third-Party System Additions: (1.0.0)
218.4, OATT 218.4 Upgrade-Related Rights: (1.0.0)
219, OATT 219 Inter-queue Allocation of Costs of Transmission Upg (1.0.0)
220, OATT 220 Advance Construction of Certain Network Upgrades: (1.0.0)
Collapse 221, OATT 221 Transmission Owner Construction Obligation for Nece (0.0.0)221, OATT 221 Transmission Owner Construction Obligation for Nece (0.0.0)
221.1, OATT 221.1 Construction Obligation: (1.0.0)
221.2, OATT 221.2 Alternative Facilities and Upgrades: (1.0.0)
222, OATT 222 Confidentiality: (1.0.0)
Collapse 223, OATT 223 Confidential Information: (1.0.0)223, OATT 223 Confidential Information: (1.0.0)
223.1, OATT 223.1 Term: (1.0.0)
223.2, OATT 223.2 Scope: (1.0.0)
223.3, OATT 223.3 Release of Confidential Information: (1.0.0)
223.4, OATT 223.4 Rights: (0.0.0)
223.5, OATT 223.5 No Warranties: (0.0.0)
223.6, OATT 223.6 Standard of Care: (1.0.0)
223.7, OATT 223.7 Order of Disclosure: (1.0.0)
223.8, OATT 223.8 Termination of Agreement(s): (1.0.0)
223.9, OATT 223.9 Disclosure to FERC or its Staff: (1.0.0)
223.10, OATT 223.10 Other Disclosures: (1.0.0)
223.11, OATT 223.11 Information in Public Domain: (0.0.0)
223.12, OATT 223.12 Return or Destruction of Confidential Informatio (0.0.0)
224-229, OATT 224-229 [Reserved] (0.0.0)
Collapse Subpart C, OATT Subpart C – Rights Related to Customer-Funded Upgrades (0.0.0)Subpart C, OATT Subpart C – Rights Related to Customer-Funded Upgrades (0.0.0)
Collapse 230, OATT 230 Capacity Interconnection Rights: (0.0.0)230, OATT 230 Capacity Interconnection Rights: (0.0.0)
230.1, OATT 230.1 Purpose: (1.0.0)
230.2, OATT 230.2 Receipt of Capacity Interconnection Rights: (2.0.0)
230.3, OATT 230.3 Loss of Capacity Interconnection Rights (7.0.0)
230.4, OATT 230.4 Transfer of Capacity Interconnection Rights: (1.0.0)
Collapse 231, OATT 231 Incremental Auction Revenue Rights: (0.0.0)231, OATT 231 Incremental Auction Revenue Rights: (0.0.0)
231.1, OATT 231.1 Right of New Service Customer to Incremental Auct (2.0.0)
231.2, OATT 231.2 Procedures for Assigning Incremental Auction Reve (1.0.0)
231.3, OATT 231.3 Determination of Incremental Auction Revenue Righ (1.0.0)
231.4, OATT 231.4 Reallocation of Incremental Auction Revenue Right (1.0.0)
231.5, OATT 231.5 Duration of Incremental Auction Revenue Rights: (1.0.0)
231.5A, OATT 231.5A Value of Incremental Auction Revenue Rights: (1.0.0)
231.6, OATT 231.6 Rate-based Facilities: (0.0.0)
Collapse 232, OATT 232 Transmission Injection Rights and Transmission With (0.0.0)232, OATT 232 Transmission Injection Rights and Transmission With (0.0.0)
232.1, OATT 232.1 Purpose: (1.0.0)
232.2, OATT 232.2 Right of Interconnection Customer to Transmission (2.0.0)
232.3, OATT 232.3 Determination of Transmission Injection Rights an (0.0.0)
232.4, OATT 232.4 Duration of Transmission Injection Rights and Tra (1.0.0)
232.5, OATT 232.5 Rate-based Facilities: (0.0.0)
232.6, OATT 232.6 Transfer of Transmission Injection Rights and Tra (1.0.0)
232.7, OATT 232.7 Loss of Transmission Injection Rights and Transmi (2.0.0)
Collapse 233, OATT 233 Incremental Available Transfer Capability Revenue R (0.0.0)233, OATT 233 Incremental Available Transfer Capability Revenue R (0.0.0)
233.1, OATT 233.1 Right of Transmission Interconnection Customer to (1.0.0)
233.2, OATT 233.2 Procedures for Assigning Incremental Available Tr (0.0.0)
233.3, OATT 233.3 Determination of Incremental Available Transfer C (0.0.0)
233.4, OATT 233.4 Duration of Incremental Available Transfer Capabi (0.0.0)
233.5, OATT 233.5 Reallocation of Incremental Available Transfer Ca (1.0.0)
233.6, OATT 233.6 Rate-based Facilities: (0.0.0)
233.7, OATT 233.7 Compensation for Utilization of Incremental Avail (1.0.0)
Collapse 234, OATT 234 Incremental Capacity Transfer Rights: (0.0.0)234, OATT 234 Incremental Capacity Transfer Rights: (0.0.0)
234.1, OATT 234.1 Right of New Service Customers to Incremental Cap (2.0.0)
234.2, OATT 234.2 Procedures for Assigning Incremental Capacity Tra (2.0.0)
234.3, OATT 234.3 Determination of Incremental Capacity Transfer Ri (1.0.0)
234.4, OATT 234.4 Duration of Incremental Capacity Transfer Rights: (0.0.0)
234.5, OATT 234.5 Reallocation of Incremental Capacity Transfer Rig (1.0.0)
234.6, OATT 234.6 Rate-based Facilities: (0.0.0)
Collapse 235, OATT 235 Incremental Deliverability Rights: (0.0.0)235, OATT 235 Incremental Deliverability Rights: (0.0.0)
235.1, OATT 235.1 Right of Transmission Interconnection Customer to (1.0.0)
235.2, OATT 235.2 Procedures for Assigning Incremental Deliverabili (0.0.0)
235.3, OATT 235.3 Determination of Incremental Deliverability Right (1.0.0)
235.4, OATT 235.4 Duration of Incremental Deliverability Rights: (1.0.0)
235.5, OATT 235.5 Transfer of Incremental Deliverability Rights: (1.0.0)
235.6, OATT 235.6 Effectiveness of Incremental Deliverability Right (0.0.0)
235.7, OATT 235.7 Loss of Incremental Deliverability Rights: (1.0.0)
235.8, OATT 235.8 Rate-based Facilities: (0.0.0)
Collapse 236, OATT 236 Interconnection Rights for Certain Transmission Int (0.0.0)236, OATT 236 Interconnection Rights for Certain Transmission Int (0.0.0)
236.1, OATT 236.1 Qualification to Receive Certain Rights: (1.0.0)
236.2, OATT 236.2 Upgrades to Merchant Transmission Facilities: (1.0.0)
236.3, OATT 236.3 Limited Duration of Rights in Certain Cases: (1.0.0)
Collapse 237, OATT 237 IDR Transfer Agreements: (0.0.0)237, OATT 237 IDR Transfer Agreements: (0.0.0)
237.1, OATT 237.1 Purpose: (1.0.0)
237.2, OATT 237.2 Requirements: (0.0.0)
237.3, OATT 237.3 Subsequent Election: (1.0.0)
237.4, OATT 237.4 Confirmation by Transmission Provider: (1.0.0)
237.5, OATT 237.5 Effect of Election On Interconnection Request: (1.0.0)
237.6, OATT 237.6 Effect On Interconnection Studies: (0.0.0)
Collapse VII, OATT VII. TRANSITION CYCLE  GENERATION INTERCONNECTION PROC (0.0.0)VII, OATT VII. TRANSITION CYCLE GENERATION INTERCONNECTION PROC (0.0.0)
Collapse VII Subpart A, OATT Part VII Subpart A INTRODUCTION (0.0.0)VII Subpart A, OATT Part VII Subpart A INTRODUCTION (0.0.0)
Collapse 300, OATT Part VII.A 300 Definitions (0.0.0)300, OATT Part VII.A 300 Definitions (0.0.0)
300 A, OATT 300 Definitions A (0.0.0)
300 B, OATT 300 Definitions B (0.0.0)
300 C, OATT 300 Definitions C (0.0.0)
300 D, OATT 300 Definitions D (0.0.0)
300 E, OATT 300 Definitions E (0.0.0)
300 F, OATT 300 Definitions F (0.0.0)
300 G, OATT 300 Definitions G (0.0.0)
300 H, OATT 300 Definitions H (0.0.0)
300 I, OATT 300 Definitions I (0.0.0)
300 L, OATT 300 Definitions L (0.0.0)
300 M, OATT 300 Definitions M (0.0.0)
300 N, OATT 300 Definitions N (0.0.0)
300 O, OATT 300 Definitions O (0.0.0)
300 P, OATT 300 Definitions P (0.0.0)
300 Q, OATT 300 Definitions Q (0.0.0)
300 R, OATT 300 Definitions R (0.0.0)
300 S, OATT 300 Definitions S (0.0.0)
300 T, OATT 300 Definitions T (0.1.0)
300 U, OATT 300 Definitions U (0.0.0)
300 V, OATT 300 Definitions V (0.0.0)
300 W, OATT 300 Definitions W (0.0.0)
301, OATT Part VII.A 301 Transition Introduction (0.0.0)
302, OATT Part VII.A 302 Site Control (0.0.0)
Collapse VII Subpart B, OATT VII Subpart B AE1-AG1 TRANSITION CYCLE #1 (0.0.0)VII Subpart B, OATT VII Subpart B AE1-AG1 TRANSITION CYCLE #1 (0.0.0)
303, OATT Part VII.B 303 Transition Eligibility (0.0.0)
304, OATT Part VII.B 304 AE1-AG1 Expedited Process Eligibility (0.0.0)
Collapse VII Subpart C, OATT VII Subpart C AG2-AH1 TRANSITION CYCLE #2 (0.0.0)VII Subpart C, OATT VII Subpart C AG2-AH1 TRANSITION CYCLE #2 (0.0.0)
305, OATT Part VII.C 305 Introduction, Overview and Eligibility (0.0.0)
306, OATT Part VII.C 306 Application Rules (0.0.0)
Collapse VII Subpart D, OATT VII Subpart D PHASES AND DECISION POINTS (0.0.0)VII Subpart D, OATT VII Subpart D PHASES AND DECISION POINTS (0.0.0)
307, OATT Part VII.D 307 Introduction (0.0.0)
308, OATT Part VII.D 308 Phase I (0.0.0)
309, OATT Part VII.D 309 Decision Point I (0.1.0)
310, OATT Part VII.D 310 Phase II (0.0.0)
311, OATT Part VII.D 311 Decision Point II (0.1.0)
312, OATT Part VII.D 312 Phase III (0.0.0)
313, OATT Part VII.D 313 Decision Point III (0.0.0)
314, OATT Part VII.D 314 Final Agreement Negotiation Phase (0.0.0)
Collapse VII Subpart E, OATT VII Subpart E MISCELLANEOUS (0.0.0)VII Subpart E, OATT VII Subpart E MISCELLANEOUS (0.0.0)
315, OATT Part VII.E 315 Assignment of Project Identifier (0.0.0)
316, OATT Part VII.E 316 Service Below The Meter Generator (0.0.0)
317, OATT Part VII.E 317 Behind The Meter Generation (0.0.0)
318, OATT Part VII.E 318 Base Case Data (0.0.0)
319, OATT Part VII.E 319 Service on Merchant Transmission Facilit (0.0.0)
320, OATT Part VII.E 320 Local Furnishing Bonds (0.0.0)
321, OATT Part VII.E 321 Internal Dispute Resolution Procedures (0.0.0)
322, OATT Part VII.E 322 Responsibilities of Transmission Provide (0.0.0)
323, OATT Part VII.E 323 Additional Upgrades (0.0.0)
324, OATT Part VII.E 324 IDR Transfer Agreement (0.0.0)
325, OATT Part VII.E 325 Regional Transmission Expansion Plan (0.0.0)
326, OATT Part VII.E 326 Transmission Owner Construction Oblig. (0.0.0)
327, OATT Part VII.E 327 Confidentiality (0.0.0)
328, OATT Part VII.E 328 Capacity Interconnection Rights (0.0.0)
329, OATT Part VII.E 329 Incremental Rights (0.0.0)
330, OATT Part VII.E 330 Rights for Transmission Interconnections (0.0.0)
331, OATT Part VII.E 331 Milestones (0.0.0)
332, OATT Part VII.E 332 Winter Capacity Interconnection Rights (0.0.0)
333, OATT Part VII.E 333 Interconnection Studies Processing Time (0.0.0)
334, OATT Part VII.E 334 Transmission Provider Website Postings (0.0.0)
Collapse VII Subpart F, OATT VII Subpart F WMPA/NON-JURISDICTIONAL AGREEMENTS (0.0.0)VII Subpart F, OATT VII Subpart F WMPA/NON-JURISDICTIONAL AGREEMENTS (0.0.0)
335, OATT Part VII.F 335 WMPA/Non-Jurisdictional Agreements (0.0.0)
Collapse VII Subpart G, OATT VII Subpart G AFFECTED SYSTEM RULES (0.0.0)VII Subpart G, OATT VII Subpart G AFFECTED SYSTEM RULES (0.0.0)
336, OATT Part VII.G 336 Affected System Rules (0.0.0)
Collapse VII Subpart H, OATT VII Subpart H UPGRADE REQUESTS (0.0.0)VII Subpart H, OATT VII Subpart H UPGRADE REQUESTS (0.0.0)
337, OATT Part VII.H 337 Upgrade Requests (0.0.0)
Collapse VII Subpart I, OATT VII Subpart I INITIAL FUNDING OF NETWORK UPGRADES (0.0.0)VII Subpart I, OATT VII Subpart I INITIAL FUNDING OF NETWORK UPGRADES (0.0.0)
338, OATT Part VII.I 338 Initial Funding of Network Upgrades (0.0.0)
Collapse VII Subpart J, OATT VII Subpart J (0.0.0)VII Subpart J, OATT VII Subpart J (0.0.0)
339, OATT Part VII.J 339 Transitional System Capability Study (0.0.0)
340 - 399, OATT Part VII 340 - 399 Reserved (2.0.0)
Collapse VIII, OATT VIII. NEW RULES GENERATION INTERCONNECTION PROCEDURE (0.1.0)VIII, OATT VIII. NEW RULES GENERATION INTERCONNECTION PROCEDURE (0.1.0)
Collapse VIII Subpart A, OATT Part VIII Subpart A INTRODUCTION (0.1.0)VIII Subpart A, OATT Part VIII Subpart A INTRODUCTION (0.1.0)
Collapse 400, OATT Part VIII.A 400 Definitions (0.1.0)400, OATT Part VIII.A 400 Definitions (0.1.0)
400 A, OATT 400 Definitions A (0.1.0)
400 B, OATT 400 Definitions B (0.1.0)
400 C, OATT 400 Definitions C (0.1.0)
400 D, OATT 400 Definitions D (0.1.0)
400 E, OATT 400 Definitions E (0.1.0)
400 F, OATT 400 Definitions F (0.1.0)
400 G, OATT 400 Definitions G (0.1.0)
400 H, OATT 400 Definitions H (0.1.0)
400 I, OATT 400 Definitions I (0.1.0)
400 L, OATT 400 Definitions L (0.1.0)
400 M, OATT 400 Definitions M (0.1.0)
400 N, OATT 400 Definitions N (0.1.0)
400 O, OATT 400 Definitions O (0.1.0)
400 P, OATT 400 Definitions P (0.1.0)
400 Q, OATT 400 Definitions Q (0.1.0)
400 R, OATT 400 Definitions R (0.1.0)
400 S, OATT 400 Definitions S (0.1.0)
400 T, OATT 400 Definitions T (0.1.0)
400 U, OATT 400 Definitions U (0.1.0)
400 V, OATT 400 Definitions V (0.1.0)
400 W, OATT 400 Definitions W (0.1.0)
401, OATT Part VIII.A 401 Applications for Cycle Process Intro (0.1.0)
402, OATT Part VIII.A 402 Applications for Cycle Process, Site Co (0.1.0)
Collapse VIII Subpart B, OATT Part VIII Subpart B APPLICATION RULES (0.1.0)VIII Subpart B, OATT Part VIII Subpart B APPLICATION RULES (0.1.0)
403, OATT Part VIII.B 403 Application Rules (0.1.0)
Collapse VIII Subpart C, OATT Part VIII Subpart C PHASES AND DECISION POINTS (0.1.0)VIII Subpart C, OATT Part VIII Subpart C PHASES AND DECISION POINTS (0.1.0)
404, OATT Part VIII.C 404 Introduction (0.1.0)
405, OATT Part VIII.C 405 Phase I (0.1.0)
406, OATT Part VIII.C 406 Decision Point I (0.2.0)
407, OATT Part VIII.C 407 Phase II (0.1.0)
408, OATT Part VIII.C 408 Decision Point II (0.2.0)
409, OATT Part VIII.C 409 Phase III (0.1.0)
410, OATT Part VIII.C 410 Decision Point III (0.1.0)
Collapse VIII Subpart D, OATT Part VIII Subpart D FINAL AGREEMENT NEGOTIATION PHASE (0.1.0)VIII Subpart D, OATT Part VIII Subpart D FINAL AGREEMENT NEGOTIATION PHASE (0.1.0)
411, OATT Part VIII.D 411 Final Agreement Negotiation Phase (0.1.0)
Collapse VIII Subpart E, OATT Part VIII Subpart E MISCELLANEOUS (0.1.0)VIII Subpart E, OATT Part VIII Subpart E MISCELLANEOUS (0.1.0)
412, OATT Part VIII.E 412 Assignment of Project Identifier (0.1.0)
413, OATT Part VIII.E 413 Service Below Generating Capability (0.1.0)
414, OATT Part VIII.E 414 Surplus Interconnection Service (0.1.0)
415, OATT Part VIII.E 415 Behind The Meter Generation (0.1.0)
416, OATT Part VIII.E 416 Base Case Data (0.1.0)
417, OATT Part VIII.E 417 Service on Merchant Transmission Facil. (0.1.0)
418, OATT Part VIII.E 418 Local Furnishing Bonds (0.1.0)
419, OATT Part VIII.E 419 Internal Dispute Resolution Procedures (0.1.0)
420, OATT Part VIII.E 420 Responsibilities of Transmission Prov. (0.1.0)
421, OATT Part VIII.E 421 Additional Upgrades (0.1.0)
422, OATT Part VIII.E 422 IDR Transfer Agreement (0.1.0)
423, OATT Part VIII.E 423 Regional Transmission Expansion Plan (0.1.0)
424, OATT Part VIII.E 424 Transmission Owner Construction Oblig. (0.1.0)
425, OATT Part VIII.E 425 Confidentiality (0.1.0)
426, OATT Part VIII.E 426 Capacity Interconnection Rights (0.1.0)
427, OATT Part VIII.E 427 Incremental Rights (0.1.0)
428, OATT Part VIII.E 428 Rights for Transmission Interconnection (0.1.0)
429, OATT Part VIII.E 429 Milestones (0.1.0)
430, OATT Part VIII.E 430 Winter Capacity Interconnection Rights (0.1.0)
431, OATT Part VIII.E 431 Interconnection Studies Processing Time (0.1.0)
432, OATT Part VIII.E 432 Transmission Provider Website Postings (0.1.0)
Collapse VIII Subpart F, OATT Part VIII Subpart F WMPA (0.1.0)VIII Subpart F, OATT Part VIII Subpart F WMPA (0.1.0)
433, OATT Part VIII.F 433 WMPA//Non-Jurisdictional Agreements (0.1.0)
Collapse VIII Subpart G, OATT Part VIII Subpart G AFFECTED SYSTEM RULES (0.1.0)VIII Subpart G, OATT Part VIII Subpart G