Black Hills Power, Inc. - Joint Open Access Transmission Tariff
 
List effective sections as of:     
All Activity      View/Export Tariff

Skip Navigation Links.
Section 0, Title and Table of Contents, 2.0.0
Section I.1, Definitions, 0.0.0
Section I.2, Initial Allocation and Renewal Procedures, 0.0.0
Section I.3, Ancillary Services, 0.0.0
Section I.4, Open Access Same-Time Information System (OASIS), 1.1.0
Section I.5, Local Furnishing Bonds, 0.0.0
Section I.6, Reciprocity, 0.0.0
Section I.7, Billing and Payment, 0.0.0
Section I.8, Accounting for the Transmission Provider's Use of the Tariff, 0.0.0
Section I.9, Regulatory Filings, 0.0.0
Section I.10, Force Majeure and Indemnification, 0.0.0
Section I.11, Creditworthiness, 0.0.0
Section I.12, Dispute Resolution Procedures, 0.0.0
Section II.0 Preamble, Part II Preamble, 0.0.0
Section II.13, Nature of Firm Point-to-Point Transmission Service, 2.0.0
Section II.14, Nature of Non-Firm Point-To-Point Transmission Service, 1.0.0
Section II.15, Service Availability, 0.0.0
Section II.16, Transmission Customer Responsibilities, 0.0.0
Section II.17, Procedures for Arranging Firm PTP Transmission Service, 1.0.0
Section II.18, Procedures for Arranging NF PTP Transmission Service, 1.0.0
Section II.19, Add’l Study Procedures For Firm PTP Trans Service Requests, 0.0.0
Section II.20, Procs if TP Unable to Compl New Facs for Firm PTP Trans Serv, 0.0.0
Section II.21, Provs Rlt'g to Trans Const/Servs on Systems of Other Utils, 0.0.0
Section II.22, Changes in Service Specifications, 0.0.0
Section II.23, Sale or Assignment of Transmission Service, 1.0.0
Section II.24, Metering/Power Fact Corr at Receipt/Delivery Pts, 0.0.0
Section II.25, Compensation for Transmission Service, 0.0.0
Section II.26, Stranded Cost Recovery, 0.0.0
Section II.27, Compensation for New Facilities and Redispatch Costs, 0.0.0
Section III.0, Part III Preamble, 0.0.0
Section III.28, Nature of Network Integration Transmission Service, 0.0.0
Section III.29, Initiating Service, 0.0.0
Section III.30, Network Resources, 0.0.0
Section III.31, Designation of Network Load, 0.0.0
Section III.32, Add'l Study Procs For NITS Requests, 0.0.0
Section III.33, Load Shedding and Curtailments, 0.0.0
Section III.34, Rates and Charges, 0.0.0
Section III.35, Operating Arrangements, 0.0.0
Schedule 1, Scheduling, System Control and Dispatch Service, 0.0.0
Schedule 2, Reactive Pwr/Voltage Ctrl from Gen or Other Sources Serv, 3.0.0
Schedule 3, Regulation and Frequency Response Service, 1.0.0
Schedule 4, Energy Imbalance Service, 0.0.0
Schedule 5, Operating Reserve - Spinning Reserve Service, 0.0.0
Schedule 6, Operating Reserve - Supplemental Reserve Service, 0.0.0
Schedule 7, LT/ST Firm PTP Trans Serv on AC Trans Sys, 1.1.0
Schedule 8, NF PTP Trans Serv on AC Trans Sys, 1.1.0
Schedule 9, Firm PTP Trans Serv on RC Conv Tie, 0.0.0
Schedule 10, NF PTP Trans Serv on RC Conv Tie, 0.0.0
Schedule 11, NITS on AC Trans Sys, 0.0.0
Schedule 12, NITS on RC Conv Tie, 0.0.0
Schedule 13, Generator Imbalance Service, 0.0.0
Attachment A, Form of SA for Firm PTP Trans Serv, 1.0.0
Attachment A-1, Form SA for Resale/Reassign/Transfer of PTP Trans Serv, 0.0.0
Attachment B, Form SA for NF PTP Trans Serv, 1.0.0
Attachment C, Methodology to Assess Available Transfer Capability, 1.0.0
Attachment D, Methodology for Completing a System Impact Study, 0.0.0
Attachment E, Index of Point-to-Point Transmission Service Customers, 0.0.0
BHP JOATT Attach F, SA for NITS, 0.0.0
Attachment G, Network Operating Agreement, 0.0.0
Attachment H, Mthly Network Trans Rev Req for Trans Serv on AC Trans Sys, 2.0.0
BHP JOATT Attach I, Index of Network Integration Transmission Service Customers, 0.0.0
BHP JOATT Attach J, Procedures for Addressing Parallel Flows, 0.0.0
Attachment K, Transmission Planning Process, 2.4.0
Attachment L, Creditworthiness Procedures, 0.0.0
Attachment M, Real Power Losses, 0.0.0
Attachment N, Facilities Included in the Transmission System, 0.0.0
Attachment O, Cluster Studies, 0.0.0
Attachment P, Standard Large Generator Interconnection Procedures, 1.0.0
Attachment Q, Small Generator Interconnection Procedures and Agreement, 0.1.0
ExportEffective DateSupercededStatusChange TypeDocket#
05/15/2015 Effective Change ER15-543-000
08/05/201405/15/2015 Superseded Change ER14-2587-000
09/30/201008/05/2014 Superseded New ER11-4461-000